Skip to content
SiteNotice Australia
Menu

Planning Notice Printing: How to Check Artwork Before Production

A guide to checking planning notice artwork, legibility and production details before printing a sign for a Victorian site.

Printing 2 min read Last reviewed 26 October 2026 SiteNotice Australia

Illustration of a notice artwork sheet with crop marks beside a finished notice board.
Illustration — not a photograph of our work.
In this article
  1. Start from the approved content
  2. Separate content approval from production approval
  3. Consider the installation environment
  4. Keep versions under control

Printing a planning notice is not the same as preparing an ordinary promotional sign. The words, application identifiers and authority instructions need to be correct, while the finished document must remain practical to display at the intended location.

A proof-checking step before printing can save an extra site visit and avoid confusion during the advertising period.

Start from the approved content

Use the notice document supplied or approved for the relevant application. Do not retype formal wording from a screenshot unless the applicant has authorised and verified the result.

Check the address, planning reference, description of the proposal, contact or inspection information and any relevant dates against the actual instruction. These are examples of fields to review, not a substitute for the authority's required notice format.

Separate content approval from production approval

An applicant may approve the legal wording while a printer confirms how the file will be reproduced. The two checks solve different problems.

A production proof should address whether the text is readable, whether images are pixelated, whether margins will be trimmed and whether any mounting arrangement might cover important information.

If the authority specifies a particular size, material or display format, follow that instruction instead of choosing purely on cost.

Consider the installation environment

An outdoor notice may require an appropriate mounting material and secure fixing. A temporary fence behaves differently from a solid wall, and weather exposure may affect the best production method.

Avoid making unsupported claims that one material is legally compliant for every authority or property type.

Keep versions under control

Label drafts and final files clearly. When a revised notice arrives, archive the earlier version and record which version was actually printed and installed. This becomes especially valuable when an architectural practice is managing several advertisements at once.

A simple workflow is: authority document received, content checked, proof approved, print job released, installation booked, finished sign photographed.

Request printing and installation: Send SiteNotice Australia your approved notice document and authority specifications for a quotation based on the actual scope and materials.

Related: Printing and preparation · Request a quote

Sources

  1. Planning Victoria — Making a submission

General information about how our service works and the notice process. The responsible authority’s or regulator’s written instructions for your application govern what is required.