Common Planning Notice Installation Problems and How to Avoid Them

The problems that most often delay a planning notice — missing instructions, wrong position, damage, no removal record, no access — and how to avoid each.

Planning notices 2 min read Last reviewed 26 October 2026 SiteNotice Australia

In this article
  1. The instructions were not sent
  2. The notice is in the wrong place or cannot be read
  3. Nobody can prove it stayed up
  4. The notice was damaged or disappeared
  5. The installer could not get in
  6. The notice came down too early — or never came down
  7. The wording was changed

Displaying a planning notice sounds simple, and usually it is. The problems below are the ones that most often cause a delay, a re-display or an awkward question later — and each has a straightforward fix.

The instructions were not sent

The authority's instructions set the number of notices, their position, size and display period. Without them, an installer is guessing. Fix: send the instructions as issued with your request; we read them before quoting and ask if anything is unclear.

The notice is in the wrong place or cannot be read

A notice behind a hedge, facing away from the street or printed too small defeats the purpose and may not satisfy the authority. Fix: we install to the instructions — visible and readable from the street — and photograph the street position and the legible text so you can see it yourself.

Nobody can prove it stayed up

A single photo from day one does not show the notice was there for the whole period. Fix: record the display end date at the start, book the removal against it, and add mid-period checks if the site is exposed.

The notice was damaged or disappeared

Weather, vandalism and building work all take notices down. Fix: tell us (or we find it during a check); we replace or re-secure it, photograph the replacement and update you promptly. Whether the advertising period has to restart is the authority's decision — but you will have the record either way.

The installer could not get in

Locked gates, hoardings and absent site contacts are the most common reason a visit fails. Fix: send gate codes, key arrangements or a site contact with the request. If access still fails, the attempt is photographed and we rearrange.

The notice came down too early — or never came down

Removing a notice before the period ends can invalidate the display; leaving it up for months looks careless. Fix: one job covering installation and removal, with the end date recorded and the site photographed after removal.

The wording was changed

A notice must say what the authority issued or approved. Fix: we print exactly the artwork supplied and never edit statutory wording. If a corrected version arrives, the right one is printed and the earlier one is kept on file.

If any of these sounds familiar, request a quote and send the instructions — most problems are avoided before the installer leaves the depot.

General information about how our service works and the notice process. The responsible authority’s or regulator’s written instructions for your application govern what is required.